Accessory Dwelling Units for Bay Area properties
    All Services

    ADUs

    Accessory Dwelling Units for Bay Area properties

    RB Master Builders specializes in Accessory Dwelling Units (ADUs) — one of the most in-demand residential projects across the Bay Area. We design and build garage conversion JADUs, attached ADUs, and detached ADUs with permit coordination, utility planning, and a clear path from concept to certificate of occupancy.

    Accessory Dwelling Units for Bay Area properties detail 1Accessory Dwelling Units for Bay Area properties detail 2Accessory Dwelling Units for Bay Area properties detail 3

    Service Categories

    Garage Conversion JADU

    Convert an existing garage into a Junior Accessory Dwelling Unit with efficient layouts, code-compliant finishes, and streamlined permitting under California ADU law.

    Attached ADU

    Expand living space by adding an ADU connected to the primary residence — ideal for multigenerational living, rental income, or a private guest suite.

    Detached ADU

    Build a freestanding Accessory Dwelling Unit on your lot with independent access, full utility coordination, and finishes that match your property goals.

    Our Process

    1

    Goals

    We clarify ADU type, site constraints, budget, and intended use — guest suite, rental, or family housing.

    2

    Plan

    We coordinate architects, engineers, and layout options for garage conversion JADU, attached, or detached ADUs.

    3

    Permit

    We manage streamlined ADU permitting and utility coordination so reviews move as efficiently as California law allows.

    4

    Build

    Our crew constructs the unit with milestone updates through final inspection and handoff.

    Project Types & Permitting Guide

    Project Types for ADUs

    Relevant project types for adus — including permitting timelines, team requirements, and utilities. Requirements vary by municipality and scope.

    Detached, attached, or garage conversion.

    Permitting Timeline

    Planning department
    Runs concurrently with building
    Building department
    4–6 weeks
    PG&E Permitting
    3 weeks – 6 months
    Public Hearings
    Not required

    Fees

    School Fees
    Depends on municipality — below 500–750 sqft it doesn't apply; above that, scales linearly

    Project Team

    Architect required
    Yes
    Structural Engineer
    Yes
    Geotechnical Engineer
    Yes for attached/detached ADUs; garage conversions typically don't require
    Topographic survey
    Yes if new ADU is close to setbacks (4ft for most municipalities)
    Civil engineer
    Unlikely
    Landscape Architect
    Unlikely
    Arborist
    If new construction is near any major trees
    Special Inspection
    Yes, if pouring new foundation

    Utilities

    Fire sprinklers
    Only if main house is sprinklered
    PG&E: Electric Panel
    Very likely, unless house already has at least a 200 amp panel
    Water Meter Upgrade
    Possible, more likely if fire sprinklers required
    Sewer upgrade
    Likely if existing sewer lateral is 3" or less

    Timelines are estimates based on typical Bay Area / California permitting norms and vary by city, lot conditions, and project scope.